Unit of competency details

ICTCBL2133A - Construct underground telecommunications infrastructure (Release 1)

Summary

Usage recommendation:
Superseded
Mapping:
MappingNotesDate
Is superseded by and equivalent to ICTCBL213 - Construct underground telecommunications infrastructureUpdated to meet Standards for Training Packages Performance Criteria clarified 13/Jan/2016
Supersedes and is equivalent to ICTTC133C - Construct underground telecommunications infrastructureOutcomes deemed equivalent. Changes to elements, performance criteria and critical evidence. 14/Jun/2010

Releases:
ReleaseRelease date
1 1 (this release) 15/Jun/2010

Qualifications that include this unit

CodeSort Table listing Qualifications that include this unit by the Code columnTitleSort Table listing Qualifications that include this unit by the Title columnUsage RecommendationRelease
ICT20213 - Certificate II in TelecommunicationsCertificate II in TelecommunicationsSuperseded
ICT20310 - Certificate II in Telecommunications CablingCertificate II in Telecommunications CablingSuperseded1-2 
ICT20513 - Certificate II in Telecommunications Fixed Wireless and Rigging InstallationCertificate II in Telecommunications Fixed Wireless and Rigging InstallationSuperseded1-2 
ICT30610 - Certificate III in Broadband and Wireless NetworksCertificate III in Broadband and Wireless NetworksSuperseded
ICT30713 - Certificate III in National Broadband Network ConstructionCertificate III in National Broadband Network ConstructionSuperseded1-2 
ICT20210 - Certificate II in TelecommunicationsCertificate II in TelecommunicationsSuperseded1-2 
ICT30110 - Certificate III in Broadband and Wireless Networks TechnologyCertificate III in Broadband and Wireless Networks TechnologySuperseded
ICT20510 - Certificate II in Telecommunications Rigging InstallationCertificate II in Telecommunications Rigging InstallationSuperseded
ICT20313 - Certificate II in Telecommunications CablingCertificate II in Telecommunications CablingSuperseded
ICT30613 - Certificate III in Broadband and Wireless NetworksCertificate III in Broadband and Wireless NetworksSuperseded
Items per page 10 | 20 | 50 | 100
Displaying items 1 - 10 of 12

Classifications

SchemeCodeClassification value
ASCED Module/Unit of Competency Field of Education Identifier 031309 Communications Equipment Installation And Maintenance  

Classification history

SchemeCodeClassification valueStart dateEnd date
ASCED Module/Unit of Competency Field of Education Identifier 031309 Communications Equipment Installation And Maintenance  15/Jun/2010 
The content being displayed has been produced by a third party, while all attempts have been made to make this content as accessible as possible it cannot be guaranteed. If you are encountering issues following the content on this page please consider downloading the content in its original form

Modification History

Not Applicable

Unit Descriptor

Unit descriptor 

This unit describes the performance outcomes, skills and knowledge required to construct underground telecommunications infrastructure made up of conduits and enclosures for cabling provisioning.

No licensing, legislative, regulatory or certification requirements apply to this unit at the time of endorsement but users should confirm requirements with the relevant federal, state or territory authority.

Application of the Unit

Application of the unit 

Technical staff whose work involves civil construction of underground telecommunications infrastructure apply the skills and knowledge in this unit.

A relevant job role is civil construction worker whose work includes installation of pits and pre-built enclosures with connecting pipes.

Licensing/Regulatory Information

Refer to Unit Descriptor

Pre-Requisites

Prerequisite units 

Employability Skills Information

Employability skills 

This unit contains employability skills.

Elements and Performance Criteria Pre-Content

Elements describe the essential outcomes of a unit of competency.

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the required skills and knowledge section and the range statement. Assessment of performance is to be consistent with the evidence guide.

Elements and Performance Criteria

ELEMENT 

PERFORMANCE CRITERIA 

1. Prepare to construct underground work

1.1. Obtain construction design plan from appropriate personnel  to scope the work and arrange for site access

1.2. Notify appropriate personnel of identified safety hazards  and other services 

1.3. Obtain plant , tools and safety equipment  to perform tasks safely and efficiently

1.4. Determine the type of underground enclosure  specified in the construction design plan that is required for the project

2. Install enclosure

2.1. Use tools according to enterprise guidelines and occupational health and safety (OHS ) regulations 

2.2. Place a foundation of suitable material  to provide a safe and stable footing prior to installing an underground enclosure in an excavation

2.3. Place a recognised barrier  over the construction where an enclosure is to be installed over power cables according to enterprise requirements or agreements with other authorities

2.4. Install an enclosure specified in the construction design plan to manufacturer's specifications using the specified materials

2.5. Install an earth mat facility under the enclosure where specified and required by the enterprise

3. Install connecting pipe works

3.1. Install conduit in trench to enterprise specifications

3.2. Connect conduit to an enclosure according to manufacturer's specification and industry practice

4. Complete project

4.1. Complete reports according to enterprise policy and record alterations to plans using appropriate symbols

4.2. Recover obsolete materials and equipment and return to appropriate point for disposal

4.3. Restore site according to the requirements of enterprise or approving authority and to customer satisfaction

4.4. Notify appropriate personnel of job completion and obtain sign off

Required Skills and Knowledge

REQUIRED SKILLS AND KNOWLEDGE 

This section describes the skills and knowledge required for this unit.

Required skills 

  • communication skills to liaise with internal and external personnel on technical and operational matters
  • literacy skills to interpret plans and specifications
  • numeracy skills to take measurements for construction work
  • planning and organisational skills to organise and maintain equipment
  • problem solving skills to solve logistics problems
  • safety awareness skills to:
  • apply precautions and required action to minimise, control or eliminate hazards that may exist during work activities
  • select and use required personal protective equipment conforming to industry and OHS standards
  • work systematically with required attention to detail without injury to self or others, or damage to goods or equipment
  • task management skills to work systematically with required attention to detail
  • technical skills to:
  • apply regulations and standards related to the installation of the enclosures
  • install earth mat facility and conduits
  • interpret drawings
  • lay foundations
  • use hand and power tools in civil construction work

Required knowledge 

  • civil construction:
  • construction plant, tools and equipment operation
  • enclosure construction methods
  • foundations
  • plans
  • legislation, codes of practice and other formal agreements that impact on the work activity
  • manufacturer's requirements for safe operation of equipment
  • specific OHS requirements relating to the activity and site conditions
  • typical issues and challenges that occur on site

Evidence Guide

EVIDENCE GUIDE 

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment 

Critical aspects for assessment and evidence required to demonstrate competency in this unit 

Evidence of the ability to:

  • install enclosures including pipe, pit and prefabricated manhole
  • construct in two different soil types: sand, rock, soil or combination soil types, and shore an excavation site to meet enterprise and regulatory requirements
  • use specialised hand or power tools and equipment normally used for excavation, pipe, conduit installation and site restoration safely
  • apply related OHS requirements and work practices associated with excavation, enclosure installation and site restoration.

Context of and specific resources for assessment 

Assessment must ensure:

  • sites where enclosure construction and may be conducted
  • use of construction equipment currently used in industry
  • relevant regulatory and equipment documentation that impact on construction.

Method of assessment 

A range of assessment methods should be used to assess practical skills and knowledge. The following examples are appropriate for this unit:

  • review of an enclosure constructed by the candidate
  • review completed documentation including reports and records of alterations
  • direct observation of the candidate constructing an underground telecommunications infrastructure
  • oral or written questioning to assess required knowledge.

Guidance information for assessment 

Holistic assessment with other units relevant to the industry sector, workplace and job role is recommended, for example:

  • ICTCBL2131A Install an above ground equipment enclosure.

Aboriginal people and other people from a non-English speaking background may have second language issues.

Access must be provided to appropriate learning and assessment support when required.

Assessment processes and techniques must be culturally appropriate, and appropriate to the oral communication skill level, and language and literacy capacity of the candidate and the work being performed.

In all cases where practical assessment is used it will be combined with targeted questioning to assess required knowledge. Questioning techniques should not require language, literacy and numeracy skills beyond those required in this unit of competency.

Where applicable, physical resources should include equipment modified for people with special needs.

Range Statement

RANGE STATEMENT 

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Appropriate personnel  may include:

  • customer representative
  • project manager
  • site manager.

Safety hazards  may refer to:

  • contact with remote power feed
  • electrical supply and areas of earth potential rise that require mandatory separation from cable work
  • hazardous conduit as in conduit colours according to AS 1345:1995 associated with a hazardous service
  • unstable ground.

Other services  may include:

  • fire services
  • gas and water mains
  • high voltage (HV) power.

Plant , tools and safety equipment  may include:

  • equipment:
  • flashing lights
  • gas and other hazard detection equipment
  • safety barriers
  • trench guards
  • warning signs and tapes
  • plant:
  • back hoe
  • bobcat
  • excavator
  • trencher
  • safety equipment:
  • personal protective clothing:
  • earmuffs
  • gloves
  • head protection
  • kneepads
  • masks
  • protective suits
  • safety boots
  • safety glasses
  • tools:
  • concrete tool
  • diggers
  • jack-hammers
  • power tools:
  • cutters
  • drills
  • saws
  • shovels.

Underground enclosure  may include:

  • conduit and pipe
  • enclosure constructed of:
  • bricks
  • concrete
  • concrete panels
  • fibreglass
  • metal
  • plastic
  • pit
  • pre-fabricated manhole.

OHS regulations  may include:

  • Australian Communications Industry Forum (ACIF) standards and codes
  • AS Communications Cabling Manual (CCM)
    Volume 1
  • AS/NZS 3000:2007
  • AS/NZS 3080:2003
  • AS/NZS 3084:2003
  • AS/NZS 3085.1:2004
  • AS/NZS IEC 61935.1:2006
  • AS/NZS IEC 61935.2:2006
  • AS/NZS ISO/IEC 14763.3:2007
  • AS/NZS ISO/IEC 15018:2005
  • AS/NZS ISO/IEC 24702:2007
  • cabling security codes and regulations
  • Environmental Protection Acts
  • OHS
  • road and traffic control legislation and codes
  • technical standards AS/ACIF S008:2006 and AS/ACIF S009:2006.

Foundation of suitable material  may include:

  • aggregate fill
  • concrete
  • gravel
  • sand.

Recognised barrier  may be:

  • insulating membrane
  • polymeric strip material.

Unit Sector(s)

Unit sector 

Telecommunications

Co-requisite units

Co-requisite units 

Competency field

Competency field 

Cabling