Unit of competency
Modification History
Release 1.
Replaces superseded equivalent CPPSIS5051A Apply land and planning law to surveying.
This version first released with CPP Property Services Training Package Version 3.
Application
This unit of competency specifies the outcomes required to apply land and planning law to surveying. The unit covers marking out urban structures and identifying urban lots and related improvements using cadastral surveying methods and equipment. The unit also covers determining azimuth for identification and re-mark surveys, and undertaking mark-out surveys to fix front and rear corners, angles and line marks. It includes calculating identification surveys and preparing reports and sketches that identify physical constraints and environmental impacts. The unit requires the ability to set up, calibrate and use surveying equipment to measure, record and reduce surveying data; and to compile reports and sketches for submission to an approving authority as part of a development application. The unit requires knowledge of land and planning law, and of the submission process for local government building approvals.
The unit supports those who work under limited supervision in a surveying team, in areas such as town planning, surveying and mapping.
Licensing, legislative, regulatory or certification requirements apply to this unit in some States where cadastral surveying must be undertaken under the supervision of a registered surveyor. Relevant state and territory regulatory authorities should be consulted to confirm those requirements.
Pre-requisite Unit
Nil
Unit Sector
Surveying and spatial information services
Elements and Performance Criteria
Elements describe the essential outcomes. |
Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions. |
||
1. |
Determine survey requirements and azimuth. |
1.1. |
Relevant information is gathered to determine survey requirements in consultation with appropriate persons . |
1.2. |
Survey marks are located as indicated on survey plan. |
||
1.3. |
Position of parcel of land corners is established from identified survey marks. |
||
1.4. |
Right on boundary or parallel azimuth is established. |
||
1.5. |
Monumented and non-monumented occupations are used to establish an azimuth parallel to street boundary. |
||
1.6. |
Assumed azimuth is adopted to enable completion of field survey, and subsequent calculations and adjustments to swing onto azimuth are made. |
||
1.7. |
Azimuth derived from marks at opposite extremities of survey is calculated. |
||
1.8. |
Relationship between alignment marks, kerb lines, kerb as laid, and occupations is interpreted when azimuth is fixed using alignment marks, kerbs and occupations shown in alignment plans. |
||
2. |
Undertake mark-out survey and fix front and rear corners, angles and line marks. |
2.1. |
Azimuth is established by direct or indirect means and front corners of allotment are fixed. |
2.2. |
Side fix is established for the allotment using occupations, and monuments or reference marks. |
||
2.3. |
Direct methods are used to establish positions of rear corners. |
||
2.4. |
Traverse and calculations from street azimuth and side fix are made to set out rear corners by indirect means. |
||
2.5. |
Requirement to use line marks on long or obstructed boundaries is identified. |
||
2.6. |
Suitable checking procedure to validate positioning of all placed marks is identified and followed. |
||
3. |
Meet local government building requirements. |
3.1. |
Re-mark surveys and local government siting requirements for the issue of building certificate are met. |
3.2. |
Relevant survey regulations relating to supervision and accuracy of surveys, field procedures, and survey searching are adhered to. |
||
3.3. |
Field notes are prepared according to organisational requirements and legal and statutory standards. |
||
4. |
Calculate identification survey. |
4.1. |
Position of improvements in relation to boundaries is calculated using industry-accepted methods . |
4.2. |
Position of improvements in relation to set-out buildings is calculated using coordinate system. |
||
5. |
Prepare draft survey report and sketches. |
5.1. |
Draft survey report and accompanying sketches are prepared for a re-mark survey according to organisational requirements. |
5.2. |
Physical constraints and environmental impacts of development are incorporated into report. |
Foundation Skills
This section describes the language, literacy, numeracy and employment skills essential to performance in this unit but not explicit in the performance criteria. |
|
Skill |
Performance feature |
Learning skills to: |
. |
Planning and organising skills to: |
|
Numeracy skills to: |
|
Oral communication skills to: |
|
Reading skills to: |
|
Writing skills to: |
|
Technology skills to: |
|
Problem-solving skills to: |
|
Range of Conditions
This section specifies work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Bold italicised wording, if used in the performance criteria, is detailed below. |
|
Appropriate persons must include at least two of the following: |
|
Industry-accepted methods must include at least one of the following: |
|
Unit Mapping Information
CPPSIS5051A Apply land and planning law to surveying
Links
Companion Volume implementation guides are found in VETNet - https://vetnet.gov.au/Pages/TrainingDocs.aspx?q=6f3f9672-30e8-4835-b348-205dfcf13d9b